For intermediate tensioning of single, three phase covered conductor line. Allowed loads for the crossarm at conductor fixing points are: Fz = 16.5 kN horizontally along conductor.
Kod | SH188 |
GTIN | 6418677407031 |
Namn | BLL avskännd regel 20 kV, single line/1-pole |